Difference between revisions of "Eurorack Box Build"

From Land Boards Wiki
Jump to navigation Jump to search
Line 14: Line 14:
 
* Rails are flush to box edges
 
* Rails are flush to box edges
 
* Next one
 
* Next one
** Screw in rails before gluing up box
+
** Screw in rails, power supply, power strip before gluing up box
  
 
=== Box Hotel Services ===
 
=== Box Hotel Services ===

Revision as of 22:11, 26 October 2022

Eurorack Plywood Box 02 cropped-720px.jpg

Box Construction

  • 3/4" plywood
  • Synthrotek 84 HP rails with threaded nut strips (both come in pairs)
  • 18-3/8" Wide
  • 6-1/2" tall
  • 4-3/4" deep
  • Glued together/clamped
    • Didn't use screws
  • Did not use 1/4-20 screws, drilled small holes into back of rails and screwed rails down w/ wood screws
  • Rails are flush to box edges
  • Next one
    • Screw in rails, power supply, power strip before gluing up box

Box Hotel Services

Nelson Power Board-720px.jpg